In a significant step towards enhancing urban mobility and reducing traffic congestion, the Delhi Development Authority (DDA) has proposed the construction of a ropeway or cable car system over the Yamuna River. This initiative aims to provide a pollution-free and efficient transportation alternative for commuters crossing the river.
Project Details
The proposed ropeway system will have cable cars with a capacity to carry up to 50 passengers each. The Lieutenant Governor of Delhi, VK Saxena, has instructed DDA to conduct a survey and submit a detailed project report within a month. Once operational, the ropeway will serve as a faster and environmentally friendly option for crossing the Yamuna.
Why a Ropeway?
The Yamuna River divides Delhi into two distinct parts. Thousands of commuters cross the river daily, primarily using overcrowded bridges, leading to heavy traffic congestion. The ropeway system aims to ease traffic on existing bridges, reduce pollution caused by vehicular emissions, and offer a quicker mode of transport.
Encouraging Pedestrian Movement
Officials have been directed to ensure that the ropeway project promotes pedestrian-friendly infrastructure. The goal is to encourage walking and reduce dependency on private vehicles, further contributing to a cleaner urban environment.
Focus on Green Mobility
The Lieutenant Governor emphasized adopting sustainable and eco-friendly transportation solutions. The ropeway is part of a larger vision to make Delhi’s public transport network modern, efficient, and pollution-free.
Next Steps in the Project
- Survey and Feasibility Study: DDA will prepare a detailed report.
- Site Selection: Locations will be finalized keeping ease of access in mind.
- Implementation Timeline: The project aims to roll out after detailed approvals.
Key Highlights of the Yamuna Ropeway Project
Feature | Details |
---|---|
System Type | Ropeway or Cable Car |
Passenger Capacity | 50 passengers per car |
Key Benefit | Reduced traffic congestion |
Focus Area | Eco-friendly transportation |
Survey Timeline | Report in 1 month |