The Namo Bharat train route will include the construction of five interchange stations in Gurugram, aimed at improving connectivity with other proposed metro lines in the region. These stations will link various parts of Gurugram and surrounding areas, enhancing passenger convenience and accessibility.
Key Highlights
- Interchange Stations:
- Stations will connect to Cyber City, Hero Honda Chowk, and Old Gurugram Metro.
- Interchanges at Rajiv Chowk, Kherki Daula, and Pachgaon will integrate with proposed metro lines.
- Integrated Connections:
- Rajiv Chowk station will link the Bhondsi to Railway Station Metro Line.
- Kherki Daula and Pachgaon stations will connect with the Sector-56 to Pachgaon Metro Line.
- ISBT Gate at Key Locations:
- Proposed Inter-State Bus Terminals (ISBT) at Rajiv Chowk and Kherki Daula will include gates for the Namo Bharat train to ensure smooth transit.
- Collaboration:
- The National Capital Region Transport Corporation Limited (NCRTC) shared detailed plans with Gurugram Metro Rail Limited (GMRL) for integration.
- Development Progress:
- GMRL has appointed a Detailed Design Consultant for Old Gurugram Metro operations.
- Tender for appointing a General Consultant will be opened on 30th November 2024.
Summary Table
Feature | Details |
---|---|
Number of Interchange Stations | 5 |
Key Locations | Cyber City, Hero Honda Chowk, Rajiv Chowk, Kherki Daula, Pachgaon |
Proposed Connections | Old Gurugram Metro, Bhondsi-Railway Station Metro, Sector-56-Pachgaon Metro |
ISBT Integration | Rajiv Chowk and Kherki Daula |
Development Partners | NCRTC and GMRL |
Tender Opening for Consultant | 30th November 2024 |