The much-anticipated Delhi-Dehradun Expressway is nearing completion, with two key sections expected to be opened to the public by October. Hereโ€™s a detailed look at the current status and progress of this major infrastructure project! ๐Ÿš€

๐Ÿ”น Current Status and Progress

  • Completion Status: The construction work from Akshardham to Khajuri Pushta and Khekra has reached 97% completion. Initially, the expressway was slated to open by August 15th, but due to slower construction progress, the project has been delayed by nearly a year. ๐Ÿ—๏ธ

๐Ÿ”น Expressway Route Details

The expressway will connect Akshardham to Khekra (Mavikalan), passing through:

  • Laxmi Nagar
  • Geeta Colony
  • Lohe ka Pul (Kailash Colony)
  • Shastri Park
  • New Usmanpur
  • Kartarnagar
  • Khajuri Khas Chowk
  • Bihari Pur
  • Ankur Vihar
  • Pavi Pushta (Loni)
  • Mandola NBCC Township

This route will enhance connectivity across multiple key areas, significantly reducing travel time between Delhi and Dehradun. ๐Ÿ›ค๏ธ

Featured Image 29 Good News: Delhi Dehradun Expressway Opening Announced. 97 Percent Work Completed.

๐Ÿ”น Reasons for Delay

  • Two-Section Division: The project was divided into two sections, which led to delays in execution. ๐Ÿ•’
  • Resource Allocation: In the Delhi segment, fewer large machines and laborers were deployed, further slowing progress. ๐Ÿšง
  • Land Disputes: A 50-meter stretch of land in the Loni area for the service road has been the subject of a dispute, contributing to the delay. โš ๏ธ

๐Ÿ”น NHAI Statement

An official from the National Highways Authority of India (NHAI) has confirmed that both sections of the expressway will be opened to the public by October. This is expected to provide much-needed relief to commuters. ๐Ÿ—“๏ธ

๐Ÿ”น Sectional Expressway Length and Connectivity

  • Length: This Section expressway spans approximately 32 kilometers.
  • Elevated Section: Out of this, 17 kilometers within Delhi is elevated, ensuring a smooth and fast commute. ๐Ÿš—
  • Connectivity: Near Mavikalan village in Baghpat, the expressway will connect with the Eastern Peripheral Expressway, further enhancing connectivity across the region. ๐ŸŒ

๐Ÿ”น Project Status

Although the project was originally scheduled for completion last year, work on both sections is still ongoing. However, with significant progress made, the expressway is on track to be partially opened soon, marking a major milestone in improving regional infrastructure. ๐Ÿ›ฃ๏ธ

Stay tuned as the Delhi-Dehradun Expressway gears up to offer a faster and more efficient route between these two major cities! ๐Ÿš—โœจ

DelhiBreakings.com: You Are Reading Delhi-NCR Fastest Hyperlocal News Portal

ย 


๐Ÿ“ฐ Latest News For You. ๐Ÿ‘‡

Something went wrong. Please refresh the page and/or try again.

Providing most accurate Delhi NCR, National and Stock Market, Automobile stuffs since 2014. Experience in Journalism with 12 Years and Awarded by 4 Journalism HONORS in career. Putting best effort to provide most reliable news point.

Leave a comment

Your email address will not be published. Required fields are marked *